Home / Documents & Cases / Structural Statutes / Infrastructure Investment and Jobs Act
Documents & Cases  · Structural Statutes

Infrastructure Investment and Jobs Act IIJA

ESLey de Inversión en Infraestructura y Empleos
The 2021 bipartisan infrastructure law that authorized about 1.2 trillion dollars, including 550 billion in new spending for roads, bridges, transit, rail, water, broadband, and power, through September 2026
A new bridge under construction over a river at sunrise beside an old truss bridge

President Biden signed the Infrastructure Investment and Jobs Act on November 15, 2021, after it passed the Senate 69 to 30 with 19 Republican votes and the House 228 to 206. It reauthorized federal highway and transit programs for five years and added about 550 billion dollars in new spending above prior levels, for a total of about 1.2 trillion dollars over the period.

Major pieces included about 110 billion dollars for roads and bridges, 66 billion for passenger and freight rail including Amtrak, 39 billion for public transit, 65 billion for broadband, mostly through the 42.45 billion dollar BEAD program for states, 55 billion for drinking water and wastewater, including replacing lead pipes, 65 billion for the power grid, and 7.5 billion for electric vehicle chargers. Much of the money flowed through formulas to states, with the rest awarded in competitive grants.

Spending ramped up slowly, as projects take years to design and permit. In 2025 the new administration paused and rewrote some programs, such as EV charger funding and broadband rules, and canceled some grants, leading to lawsuits by states. The law's highway and transit authorizations expired on September 30, 2026, and Congress worked on a new multiyear bill while considering short-term extensions. Supporters credit the law with repairing bridges and modernizing infrastructure, while critics say it added to deficits and spent slowly.

The Contemporary Era
Timeline
August 10, 2021
Senate passes
69 to 30 vote.
November 15, 2021
Signed
Infrastructure law enacted.
February 2025
EV charger pause
Program halted and later revised.
September 30, 2026
Authorization expires
Highway and transit programs lapse.
Profile
StatusActive
AbbreviationIIJA
Legal basisPublic Law 117-58
Official sitetransportation.gov
Key Facts
Signed November 15, 2021
Total About 1.2 trillion dollars
New spending About 550 billion dollars
Broadband (BEAD) 42.45 billion dollars
Highway programs expired September 30, 2026
At a Glance
Date Signed November 15, 2021
Facts last checked November 3, 2026. Report a correction